Savana 1/2 Ton Van V8-5.7L VIN R (2001)
1. Remove the instrument panel from the vehicle. Refer to IP Carrier Replacement in Instrument Panel, Gages, and Console.
2. Disconnect the vacuum hose (1) from the defrost actuator (2).
3. Depress the clip and remove the defrost actuator (2) from the heater module.
INSTALLATION PROCEDURE
1. Install the defrost actuator (2) to the heater module.
2. Connect the vacuum hose (1) to the defrost actuator (2).
3. Install the instrument panel to the vehicle. Refer to IP Carrier Replacement in Instrument Panel, Gages, and Console.
Mode Actuator Replacement (Lower)
REMOVAL PROCEDURE