Savana 1/2 Ton Van V8-5.7L VIN R (2001)
18. Install the evaporator tube (2) to the vehicle.
19. Recharge the A/C system.
20. Leak test the fitting(s) of the repaired or reinstalled component using the J 39400-A.
21. Install the grille.
22. Install the engine coolant reservoir.
23. Install the air cleaner.
For a description of the RPO Code(s) shown in this article/images refer to the RPO Code List found at Vehicle/Application ID See: Application and
ID/RPO Codes