Savana 1/2 Ton Van V8-5.7L VIN R (2001)
5. Install the evaporator tube (4) to the vehicle.
6. Recharge the A/C system. Refer to Refrigerant Recovery and Recharging.
7. Leak test the fitting(s) of the repaired or reinstalled component using the J 39400-A.
8. Install the grille.
9. Install the engine coolant reservoir.
10. Install the air cleaner.
For a description of the RPO Code(s) shown in this article/images refer to the RPO Code List found at Vehicle/Application ID See: Application and
ID/RPO Codes