Savana 1/2 Ton Van V8-5.7L VIN R (2001)
3. Install the evaporator tube to the condenser.
Tighten
Tighten the evaporator tube to 19 N.m (14 lb ft).
4. Install the radiator grille.
5. Install the new O-ring seal.
6. Coat the O-ring with 525 viscosity refrigerant oil.
7. Install the evaporator tube to the evaporator (5).
Tighten
Tighten the evaporator tube to 19 N.m (14 lb ft).
8. Install the evaporator tube to the auxiliary A/C evaporator underbody front tube assembly, if equipped.
Tighten
Tighten the evaporator tube to 19 N.m (14 lb ft).
8.1.
Remove the safety stands.
8.2.
Lower the vehicle.
9. Install the retaining bolt (1) to the evaporator case.
Tighten
Tighten the retaining bolt to 2 N.m (18 lb in).
10. Evacuate and recharge the A/C system. Refer to Refrigerant Recovery and Recharging.
11. Leak test the fittings of the components using the J 39400-A.