Savana 1/2 Ton Van V8-5.7L VIN R (2001)
1. Install the new tube adapter (1).
Tighten the tube adapter to 31 Nm (23 ft. lbs.).
2. Install the brake line.
Tighten the brake line to 30 Nm (22 ft. lbs.).
3. Install the EHCU shield (6) and shield bolts (7).
Tighten the EHCU shield bolts to 12 Nm (8 ft. lbs.).
4. Bleed the hydraulic brake system. Refer to Automated Bleed Procedure.