gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Battery Tray Replacement (Primary)|Page 11613 > < Battery Tray Replacement (Primary)|Page 11611
Page 3
background image

4. Install the battery.
5. Install the battery hold-down retainer and bolt.

Tighten the battery hold-down retainer bolt to 25 N.m (18 lb ft).

6. Install the positive battery cable to the battery with the battery terminal bolt.

Tighten the battery terminal bolt to 17 N.m (13 lb ft).

7. Install the battery negative cable to the battery with the battery terminal bolts.

Tighten the battery terminal bolt to 17 N.m (13 lb ft).

8. Install the coolant recovery reservoir.

Tighten the bolt to 11 N.m (97 lb in).

Battery Tray Replacement (Primary)|Page 11613 > < Battery Tray Replacement (Primary)|Page 11611