Savana 2500 V8-6.0L VIN U (2006)
9. Remove the floor rail (1, 2) from the vehicle.
INSTALLATION PROCEDURE
1. Position the floor rail (2) to the vehicle.
2. Install the rear floor mat/carpet.
3. Raise the vehicle and support the vehicle with safety stands. Refer to Vehicle Lifting.
4. Install the rear seat track reinforcements to the seat track studs (12 and 15 Passenger).
5. Inspect the nuts (3) in order to ensure that the sealer is intact.
6. If the sealer is not intact, apply a medium bodied sealer to the nuts before installing.
7. Install the nuts to retain the floor rail to the vehicle.