Savana 2500 V8-6.0L VIN U (2006)
5. Remove the mounting screws that fasten the EBCM (2) to the brake pressure modulator valve (BPMV) (1).
6. Remove the EBCM (2) from the BPMV (1). Removal may require a light amount of force.
7. Clean the BPMV to EBCM mounting surfaces with a clean cloth.
Installation Procedure
Important: Do not use RTV or any other type of sealant on the EBCM gasket or mating surfaces.
1. Install the EBCM (2) on to the BPMV (1).
Notice: Refer to Fastener Notice in Service Precautions.
2. Install the screws to the EBCM (2).
Tighten the screws to 5 Nm (44 inch lbs.) in an X-pattern.
3. Connect the electrical connectors to the EBCM.