Savana 2500 V8-6.6L DSL Turbo VIN 6 (2007)
10. Install the EGR cooler pipe hose to the EGR cooler tube and Reposition the EGR cooler pipe clamp (1).
11. Position the transmission fill tube.
12. Install the transmission fluid fill tube to bell housing nut.
Tighten the nut to 18 N.m (13 lb ft).
13. Install the EGR cooler pipe bolt.
Tighten the bolt to 9 N.m (80 lb in).
14. Fill the cooling system.
15. Install the engine cover.