gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

EGR Valve|Diagrams|Page 9861 > < EGR Valve|Diagrams|Page 9859
Page 5
background image

2. Install NEW intake manifold tube gaskets (1) as required.
3. Position the EGR valve (3) to the EGR cooler tube (4).
4. Install the EGR valve to EGR cooler tube bolts (2).

Tighten the bolts to 20 N.m (15 lb ft).

5. Install the EGR valve/cooler tube assembly to the engine.
6. Install the EGR valve/cooler tube assembly bolts and nut.

Tighten the bolts to 25 N.m (18 lb ft).

EGR Valve|Diagrams|Page 9861 > < EGR Valve|Diagrams|Page 9859