gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Turbocharger Coolant Hoses/Pipes Replacement (Inlet - LLY, LBZ)|Page 11131 > < Turbocharger Coolant Hoses/Pipes Replacement (Inlet - LLY, LBZ)|Page 11129
Page 5
background image

5. Install the turbocharger heat shield and the 3 bolts.

Tighten the turbocharger heat shield bolts to 10 N.m (89 lb in).

6. Position the turbocharger inlet cooling hose/pipe (2) to the thermostat housing and position the compression clamp (1) to secure.
7. Fill the cooling system. 
8. Install the engine cover. 
9. Install the air cleaner outlet duct. 

Turbocharger Coolant Hoses/Pipes Replacement (Inlet - LLY, LBZ)|Page 11131 > < Turbocharger Coolant Hoses/Pipes Replacement (Inlet - LLY, LBZ)|Page 11129