Savana 2500 AWD V8-5.3L VIN T (2004)
8. Remove the 3-2 control solenoid retainer.
9. Remove the 3-2 control solenoid.
Installation Procedure
1. Install the 3-2 control solenoid.
2. Install the 3-2 control solenoid retainer.
3. Install the 1-2 and 2-3 shift solenoids.
4. Install the 1-2 and 2-3 shift solenoid retainers.
5. Install the pressure control solenoid. Ensure that the electrical tabs are facing outboard.