Savana 3/4 Ton Van V8-6.5L DSL Turbo VIN F (2001)
1. Install the PCM mounting hardware.
2. Slide the PCM into the mounting bracket.
3. Install the PCM mounting nuts.
IMPORTANT: Ensure that the PCM electrical harness is properly routed to avoid contact with the engine cover during installation.
4. Reconnect the PCM harness connectors.
5. Install the engine cover.
6. Connect the negative battery cables. The MIL, the antilock and the brake lamps will continue to be enabled until the PCM is programmed. Once
the programming is complete, the lamps will be turned OFF and normal operation will occur. See: Testing and Inspection/Programming and
Relearning