Savana 3/4 Ton Van AWD V8-5.3L VIN T (2003)
2. Install the junction block base (3) to the floor studs. Ensure the remaining electrical connections (4, 5) are not captured under the junction block
base after installations the floor studs.
NOTE: Refer to Fastener Notice in Service Precautions.
3. Install the junction block base nuts (1) to the floor studs.
Tighten
Tighten the block base nuts to 5 N.m (44 lb in).
4. Install the junction block (1) to the junction block base. Ensure the retaining tabs are fully seated.
Tighten
Tighten the bolts (2) to 5 N.m (44 lb in).
5. Connect the electrical connectors (1), if equipped with YF7.