Savana 3/4 Ton Van AWD V8-5.3L VIN T (2003)
6. Install the upper intermediate shaft to the intermediate shaft bearing retaining bolt.
Tighten the bolt to 30 Nm (22 ft. lbs.).
7. Install the intermediate shaft seal upper retaining screws.
Tighten the screws to 2 Nm (18 inch lbs.).
8. Reposition the cruise control module (3) and install the cruise control module mounting nuts (2).
Tighten the nuts to 5 Nm (44 inch lbs.).