Savana 3/4 Ton Van AWD V8-5.3L VIN T (2003)
3. Install the 1-2 and 2-3 shift solenoids.
4. Install the 1-2 and 2-3 shift solenoid retainers.
5. Install the pressure control solenoid.
Ensure that the electrical tabs are facing outboard.
Notice: Refer to Fastener Notice in Service Precautions.
6. Install the pressure control solenoid retainer and retaining bolt.
^
Tighten the pressure control solenoid retaining bolt to 11 Nm (97 inch lbs.).
7. Connect the internal wiring harness electrical connectors to the following components:
^
Transmission fluid pressure switch (1)
^
1-2 shift control solenoid (2)