gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

4L60-E/4L65-E/4L70-E - Automatic Transmission|Page 13301 > < 4L60-E/4L65-E/4L70-E - Automatic Transmission|Page 13299
Page 6
background image

1. Install the transmission oil cooler line to the vehicle.

Important: Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. All retaining rings
being installed must be New.

2. Install the new retaining ring (E-clip) into the quick connect fitting.

Important: Ensure the transmission lines are position in the support bracket and the clips are installed.

3. Install the transmission oil cooler lines to the transmission.
4. Lower the vehicle.

5. If equipped with the auxiliary oil cooler, install the inlet line to the radiator and the outlet to the auxiliary cooler line.

4L60-E/4L65-E/4L70-E - Automatic Transmission|Page 13301 > < 4L60-E/4L65-E/4L70-E - Automatic Transmission|Page 13299