Savana 4500 V8-6.6L DSL Turbo (2009)
13. Position the engine wiring harness.
14. Install the glow plug wire harness retaining bolts at the lower part of the left upper valve cover.
15. Install the connector bracket bolts (1) and tighten to 10 Nm (89 lb in).
16. Install the wiring harness clip to the main connector bracket.
17. Connect the left side main engine harness electrical connector.
18. Install the engine wiring harness bracket bolt (1) and tighten to 10 Nm (89 lb in).