Savana 4500 V8-6.6L DSL Turbo (2009)
10. Connect the engine wiring harness electrical connector (1) to the EGR valve.
11. Install the EGR cooler pipe hose to the EGR cooler tube and reposition the EGR cooler pipe clamp (1).
10. Connect the engine wiring harness electrical connector (1) to the EGR valve.
11. Install the EGR cooler pipe hose to the EGR cooler tube and reposition the EGR cooler pipe clamp (1).