gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

How to Disable Electrical System|Page 3077 > < How to Disable Electrical System|Page 3075
Page 32
background image

19. Install the 120-volt cable connector screws.

Tighten
Tighten the screws to 6 N.m (53 lb in).

20. Install the power cable from the service disconnect switch to the fuse block.
21. Install the service disconnect power cable nut to the service disconnect switch.

Tighten
Tighten the nut to 10 N.m (89 lb in).

22. Install NEW tie straps securing the power cable to the ESB.

IMPORTANT:  The power cable must be installed to the negative side of the high current connector.

How to Disable Electrical System|Page 3077 > < How to Disable Electrical System|Page 3075