gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Upper Intake Manifold Sight Shield Replacement|Page 3035 > < Upper Intake Manifold Sight Shield Replacement|Page 3033
Page 8
background image

1. Install NEW fuel injector lower O-ring seals onto the injectors.
2. Lubricate the NEW O-ring seals with clean engine oil.

Note:  Push down firmly on both sides of the rail until all the injectors have been seated into their bores.

3. Install the fuel rail.

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

4. Install the fuel rail bolts.

Tighten the bolts to 10 Nm (89 lb in).

5. Install a NEW throttle body gasket to the intake manifold.
6. Install the throttle body.
7. Install the throttle body bolts/nuts.

Upper Intake Manifold Sight Shield Replacement|Page 3035 > < Upper Intake Manifold Sight Shield Replacement|Page 3033