Sierra 2500 4WD V8-6.0L (2008)
3. Position the tie down loop.
4. Plug weld accordingly.
5. Clean and prepare all welded surfaces.
6. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair.
7. Paint and repair the area. Refer to Basecoat/Clearcoat Paint Systems.Resistance Spot Welded Full Panel Replacement