Sierra 2500 4WD V8-6.6L DSL Turbo (2007)
3. Connect the engine wiring harness electrical connector (1) to the generator (2).
4. Install the engine wiring harness terminal (3) to the generator.
5. Install the engine wiring harness nut (1).
Tighten the nut to 9 N.m (80 lb in).
6. Position the engine wiring harness boot (2) in order to cover the terminal stud.
7. Install the drive belt.
8. Connect the negative battery cable.