gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Procedures|Page 10035 > < Procedures|Page 10033
Page 10
background image

25. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gauge) or thicker multi-strand wire. These wires will be used to fabricate the roof rail 

air bag deployment harness.

26. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
27. Twist together one end from each of the wires in order to short the wires.

28. Twist together one connector wire lead to one deployment wire.

29. Bend flat the twisted connection.
30. Secure and insulate the connection using electrical tape.

31. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
32. Connect the deployment harness to the yellow connector of the roof rail module.

Procedures|Page 10035 > < Procedures|Page 10033