gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Power and Ground Distribution > < Starter Solenoid|Service and Repair|Page 16340
Page 5
background image

Notice:  Refer to Fastener Notice.

4.  Install the solenoid bolts.

Tighten the bolts to 10 N.m (89 lb in).

5.  Wipe the excess silicone pressed out during the solenoid installation from around the base of the solenoid to make a weather proof seal.

6.  Install the cable to the M-terminal stud between the washers and terminal nut.
7.  Tighten the M-terminal stud nut.

Tighten the nut to 8 N.m (71 lb in).

8.  Using Three Bond silicone 1207B, GM P/N 97720043, seal the M-terminal stud connection (2).
9.  Reposition the M-terminal stud weather cover (1).

10.  Bench test the starter in a free-run condition prior to installation.
11.  Install the starter motor.

Power and Ground Distribution > < Starter Solenoid|Service and Repair|Page 16340