gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Starting System > < Generator Battery Control Module Replacement|Page 7517
Page 2
background image

NOTE:  Refer to Fastener Notice in Service Precautions.

2. Install the generator bolts.

Tighten the bolts to 50 N.m (37 lb ft).

3. Install the generator cable to the generator, perform the following:

1. Install the generator cable.
2. Install the generator cable nut to the terminal stud.

Tighten the nut to 9 N.m (80 lb in).

3. Slide the boot over the terminal stud.

4. Connect the generator electrical connector (3).
5. If necessary, install the engine sight shield.
6. Install the accessory drive belt.

Starting System > < Generator Battery Control Module Replacement|Page 7517