gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Door Hinge Pin and Bushing Replacement - Front Door|Page 13696 > < Door Hinge Pin and Bushing Replacement - Front Door|Page 13694
Page 2
background image

1. Repair any damage done to the pillar during the drilling or the removal of the hinge.
2. Position the service hinge within the scribe marks on the pillar.
3. Center punch each stud location on the hinge pillar according to the service hinge.
4. Drill a 3 mm (1/8 in) (1) pilot hole at each center punch location.

Important:  Drill bit must be exact size.

5. Drill an 11.5 mm (29/64 in) hole at the pilot locations for the studs.
6. Clean and prepare all of the bare metal surfaces.

Important:  Prior to refinishing, refer to the publication GM 4901M-D-2000 GM Approved Refinish Materials for recommended
products. Do not combine paint systems. Refer to paint manufacturer's recommendations.

7. Apply approved anti-corrosion primer.

8. Feed fish wire (1), GM P/N 15017229 or the equivalent, through the hinge, the hinge stud hole and out of the conduit hole in the pillar
9. Install stud (2), GM P/N 15017230, supplied with the service hinge into the wire end. Pull the stud into position.

10. Hold the stud in position with the hinge and remove the fish wire.
11. Draw the stud (4) tight through the pillar. Use the nuts GM P/N 11516746 supplied.
12. Repeat steps 8-11 on the remaining stud locations.
13. Remove each service nut.
14. Apply a full-bodied caulk to the entire hinge mounting surface in order to ensure a proper seal.

Notice:  Refer to Fastener Notice in Service Precautions.

15. Install the hinge (2) to the pillar (3). Use the supplied nuts (1).

Door Hinge Pin and Bushing Replacement - Front Door|Page 13696 > < Door Hinge Pin and Bushing Replacement - Front Door|Page 13694