gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Procedures|Page 14478 > < Procedures|Page 14476
Page 5
background image

7. Install the fasteners (4) to the side rail/rear base.

Tighten the side rail/rear base fasteners to 3 N.m (27 lb in).

8. Install the roller bar/rear cross rail assembly to the vehicle.
9. Install the fasteners (1) to each side of the rear base.

Tighten the rear base fasteners to 3 N.m (27 lb in).

10. Install the fasteners to the front bases.

Tighten the front base fasteners to 3 N.m (27 lb in).

11. Install the base covers.
12. Install the inboard fasteners to the luggage carrier base covers.

Tighten the luggage carrier base cover fasteners to 1.2 N.m (11 lb in).

Procedures|Page 14478 > < Procedures|Page 14476