gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Starter Cable|Service and Repair|Page 14786 > < Starter Cable|Service and Repair|Page 14784
Page 5
background image

2. Install the starter solenoid cable to the positive battery terminal.

3. NOTE:  Refer to Fastener Notice in Service Precautions.

Tighten the starter solenoid cable nut (5).

Tighten the nut to 17 N.m (13 lb ft).

4. Close the starter solenoid cable cover at the positive battery terminal.
5. Install the starter solenoid cable terminal (2) to the mega fuse stud.
6. Install the starter solenoid cable nut (1) to the mega fuse stud.

Tighten the nut to 9 N.m (80 lb in).

7. Install the starter solenoid cable clip (4) to the A/C evaporator tube.

8. Install the mega fuse cover.

Starter Cable|Service and Repair|Page 14786 > < Starter Cable|Service and Repair|Page 14784