gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 6455 > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 6453
Page 4
background image

-

Rotate the retainer into position and ensure all three "Ears" are visible on the inside of the connector and the ring can move in the slots freely.

-

Repeat the above procedures for installation of the remaining retaining ring.

NOTICE:  Ensure the cooler line has the plastic cap positioned onto the cooler line. If no plastic cap exist, obtain a NEW plastic cap and
position it onto the cooler line prior to cooler line installation.

3. Insert the cooler line into the connector until a "Click" is heard or felt.

-

Ensure the yellow identification band on the cooler line is hidden within the quick connector, (this indicates proper joint seating).

-

Pull back sharply on the cooler line to ensure proper installation.

-

Plastic cap by sliding over the attached joint until the cap snaps into place and it is flushed with the connector.

-

Pull back sharply on the cooler line to assure the line is fastened into the connector. If the plastic cap is not properly seated, remove the
existing retaining clip and install a "NEW" retaining clip per step 2 of the installation procedure.

A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 6455 > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 6453