Yukon Denali 2WD V8-6.0L Hybrid (2010)
15. Install the 3 phase cable retainer (1) to the bracket.
16. Install the 3 phase cable retainer nut (2).
Tighten the nut to 9 Nm (80 lb in).
17. Install the PIM 3 phase cables (3, 5) into the PIM distribution box with new seals (6).
18. Install the PIM 3 phase cable mounting fasteners (2, 4).
Tighten the mounting fastener to 9 Nm (80 lb in).
Caution: Always remove and install the High Voltage terminal fasteners with a magnet tipped socket. Never touch the exposed electronic circuit
board surface or components. Dropped fasteners or physical contact may result in electronic circuit board damage.
19. Install the PIM 3 phase cable terminal fasteners (1).
Tighten the terminal fastener to 9 Nm (80 lb in).