Yukon Denali 2WD V8-6.0L Hybrid (2010)
20. Install a new seal (3) on the PIM distribution box.
21. Position the terminal cover (2) onto the PIM distribution box ensuring the seal remains in place.
22. Tighten the terminal cover fasteners (1).
Tighten the fasteners to 9 Nm (80 lb in).
23. Perform the high voltage enabling. Refer to High Voltage Enabling (See: Battery System, Hybrid Drive/Testing and Inspection/Initial Inspection
and Diagnostic Overview/High Voltage Enabling).