gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Power Control System, Hybrid Drive > < Generator Control Module Ground Strap Replacement|Page 3485
Page 5
background image

20. Install a new seal (3) on the PIM distribution box.
21. Position the terminal cover (2) onto the PIM distribution box ensuring the seal remains in place.
22. Tighten the terminal cover fasteners (1).

Tighten the fasteners to 9 Nm (80 lb in).

23. Perform the high voltage enabling. Refer to High Voltage Enabling   (See: Battery System, Hybrid Drive/Testing and Inspection/Initial Inspection

and Diagnostic Overview/High Voltage Enabling).

Power Control System, Hybrid Drive > < Generator Control Module Ground Strap Replacement|Page 3485