gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Procedures|Page 18169 > < Procedures|Page 18167
Page 3
background image

11. Inspect the J 38826 and the appropriate pigtail adapter for damage. Replace as needed.
12. Short the 2 SIR deployment harness (1) leads together using 1 banana plug seated into the other.
13. Connect the appropriate pigtail adapter (2) to the SIR deployment harness.

14. Extend the SIR deployment harness and adapter to full length from the deployment fixture.
15. Connect the seat belt pretensioner connector (1) to the adapter (2) on the deployment harness (3).

16. IMPORTANT:  When deploying a seat belt pretensioner, the rapid expansion of gas is very loud. Notify the people in the immediate area that a

seat belt pretensioner will be deployed.

Clear the area of people.

17. Separate the 2 banana plugs on the SIR deployment harness.

18. Place a 12 volt minimum/2 amp minimum power source, such as a vehicle battery, near the shorted end of the harness.
19. Connect the SIR deployment harness wires to the power source. Seat belt pretensioner deployment will occur when contact is made.
20. Disconnect the SIR deployment harness from the power source after the seat belt pretensioner deploys.

Procedures|Page 18169 > < Procedures|Page 18167