gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Electronic Brake Control Module > < Brake Fluid Pump|Locations|Page 10498
Page 2
background image

1. Install the PCP (1) into the vehicle. Ensure the bottom of the PCP motor is secured in the bottom mounting grommet on the PCP mounting bracket.

2. Notice:  Refer to Fastener Notice in Service Precautions.

Install the PCP front and side mounting bracket bolts (2,3).
Tighten the bolts to 15 Nm (10 ft. lbs.). 

3. Install the PCP electrical connector to the mounting bracket. Check to insure the connector is locked into place.
4. Connect the PCP electrical connector to the vehicle connector harness.

5. Remove the cap or plug from the outlet pipe and install the outlet pipe (3) to the PCP (2).

Tighten the brake fluid outlet pipe nut to 25 Nm (18 ft. lbs.). 

6. Install the inlet hose and clamp (1) to the PCP (2).
7. Remove the crimping tool from the inlet hose.
8. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure.
9. Fill the master cylinder reservoir. Refer to Master Cylinder Reservoir Filling.

10. Using a scan tool, perform a precharge pump bleed procedure. Refer to ABS Automated Bleed Procedure (w/o JL4) ABS Automated Bleed

Procedure (W/JL4),

Electronic Brake Control Module > < Brake Fluid Pump|Locations|Page 10498