Accord L4-2.2L SOHC VTEC (1994)
Sending Unit Test
5. Measure the resistance between the A and B terminals at E (EMPTY), 1/2 (HALF FULL) and F (FULL) by moving the float.
If unable to obtain the illustrated readings, replace the fuel gauge sending unit.