honda Workshop Repair Guides

Honda Workshop Service and Repair Manuals

A/T Clutch Pressure Control Solenoid Valve A and B Replacement|Page 4411 > < A/T Clutch Pressure Control Solenoid Valve A and B Replacement
Page 2
background image

10. Remove the A/T clutch pressure control solenoid valve A and B, ATF pipes (C), and gasket (D).
11. Check the fluid passage of the A/T clutch pressure control solenoid valve for dust and dirt, and clean the passage if necessary.
12. Install the new solenoid valve body gasket on the solenoid valve cover, and install the ATF pipes with the filter end in the transmission housing.

Install new O-rings over the ATF pipes.

13. Install the A/T clutch pressure control solenoid valve A and B.
14. Secure the harness cover with the bolt.
15. Check the connectors for rust, dirt, or oil, clean or repair if necessary, then connect the connectors securely.
16. Attach the shift cable end to the control lever, then insert the control pin into the control lever hole through the shift cable end, and secure the

control pin with the spring clip/washer.

17. Secure the shift cable bracket.,
18. Install the battery base.
19. Install the intake air duct and air cleaner housing.
20. Install the battery tray, battery, and battery holddown bracket, then connect the battery terminals.
21. Enter the radio code (navigation code), then enter the customer's audio presets, and set the clock.
22. Do the power window control unit reset procedure.
23. If the IMA battery level gauge (BAT) displays no segments, start the engine in the P or N position, and hold it between 3,500 and 4,000 rpm with

no load until the BAT displays at least three segments.

A/T Clutch Pressure Control Solenoid Valve A and B Replacement|Page 4411 > < A/T Clutch Pressure Control Solenoid Valve A and B Replacement