honda Workshop Repair Guides

Honda Workshop Service and Repair Manuals

Power and Ground Distribution > < Starter Relay|Locations|Page 7412
Page 1
background image

Starter Solenoid: Testing and Inspection

M/T

A/T

1. Check the hold-in coil for continuity between the S terminal (A) and the armature housing (ground). There should be continuity.

-

If there is continuity, go to step 2.

-

If there is no continuity, replace the solenoid.

2. Check the pull-in coil for continuity between the S terminal (A) and M terminal (B). There should be continuity.

-

If there is continuity, the solenoid is OK. 

-

If there is no continuity, replace the solenoid.

Power and Ground Distribution > < Starter Relay|Locations|Page 7412