honda Workshop Repair Guides

Honda Workshop Service and Repair Manuals

Shift Control Solenoid Valve <--> [Shift Solenoid, A/T] > < Key Interlock Solenoid Test|Page 4942
Page 1
background image

Shift Interlock Solenoid: Service and Repair

Shift Lock Solenoid Test/Replacement

1.  Remove the solenoid pin.
2.  Remove the self-locking nuts and shift lock solenoid.

Shift Lock Solenoid Test/Replacement

3.  Install the new shift lock solenoid in the reverse order of removal, and adjust its position.

^  When the shift lock solenoid is ON, check that there is a clearance of 4.2 ± 0.5 mm (0.165 ± 0.020 in) between the top of the shift lock lever

and the lock pin groove, and tighten the self-locking nuts.

NOTE:  Use brand-new self-locking nuts.

^  When the shift lock solenoid is OFF, make sure that the lock pin is blocked by the shift lock lever.

Shift Lock Solenoid Test/Replacement

NOTE:  Test the solenoid after you assembled it.

Shift Control Solenoid Valve <--> [Shift Solenoid, A/T] > < Key Interlock Solenoid Test|Page 4942