Accord Sedan V6-2.7L SOHC (24 Valve) (1996)
Ignition Control Module: Testing and Inspection
Note: - See "Computers and Control Systems" when the MIL blinks.
- Perform an input test for the ignition control module (ICM) after finishing the fundamental tests for the ignition system and the fuel and
emissions systems.
1. Remove the distributor ignition cap, the distributor ignition rotor, and the leak cover.
2. Disconnect the wires from the ICM.
3. Turn the ignition switch ON and check for battery voltage between the YEL wire and body ground. IF there is no battery voltage check the
ignition coil for proper operation or check for an open in the YEL wire between the ignition coil and the ICM. If there is battery voltage proceed to
step 4.
4. Turn the ignition switch ON and check for battery voltage between the GRN wire and body ground. If there is no battery voltage check the ignition
coil for proper operation or check for an open in the GRN wire between the ignition coil and the ICM. If there is battery voltage proceed to step 5.
5. Check the YEL/GRN wire between the ECM and the ICM.
6. If all tests are normal replace the ICM.