CR-V LX 4WD L4-2.4L (2002)
9.
Install the shift cable cover, and torque the three mounting bolts to 9.8 N.m (7.2 lb-ft) in the sequence shown.
10.
Center-punch a completion mark above the seventh character of the engine compartment VIN.
9.
Install the shift cable cover, and torque the three mounting bolts to 9.8 N.m (7.2 lb-ft) in the sequence shown.
10.
Center-punch a completion mark above the seventh character of the engine compartment VIN.