CR-Z L4-1.5L Hybrid (2011)
Installation
1. Set the new bulkhead parts, and fix the bulkhead side stay and the bulkhead upper center frame with the mounting bolts. Measure the front
compartment diagonally.
2. Check the body dimensions.
-
Engine compartment
-
Front wheelhouse lower member position
-
Engine compartment and front floor, under view
-
Repair chart, top view
-
Repair chart, side view
3. Tack weld the new parts into position.
4. Temporarily install the front fender, the hood, and the door, then check for differences in level and clearance.
Check the external parts fitting positions. If necessary, check the headlight and the front bumper positions. Make sure the body lines flow
smoothly.
5. Do the main welding.
-
Weld the bulkhead side stay (A) to the front side frame (B) and the bulkhead lower crossmember (C).
-
Weld the bulkhead lower crossmember side stiffener (D) and the wheelhouse lower extension (E).