honda Workshop Repair Guides

Honda Workshop Service and Repair Manuals

Crankshaft Main Bearing > < Connecting Rod Bolt Inspection
Page 1
background image

Connecting Rod: Testing and Inspection
End Play Inspection

Connecting Rod and Crankshaft End Play Inspection 

1. Remove the oil pump.
2. Remove the baffle plates.

3. Measure the connecting rod end play with a feeler gauge between the connecting rod and crankshaft.

Connecting Rod End Play

Standard (New): 0.15 - 0.35 mm (0.006 - 0.014 inch)  
Service Limit: 0.40 mm (0.016 inch) 

4. If the connecting rod end play is out-of-tolerance, install a new connecting rod, and recheck. If it is still out-of-tolerance; replace the crankshaft.

5. Push the crankshaft firmly away from the dial indicator, and zero the dial against the end of the crankshaft. Then pull the crankshaft firmly back

toward the indicator; the dial reading should not exceed the service limit.
Crankshaft End Play

Standard (New): 0.10 - 0.35 mm (0.004 - 0.014 inch)  
Service Limit: 0.45 mm (0.018 inch) 

6. If the end play is out-of-tolerance, replace the thrust washers and recheck, if it is still out-of-tolerance, replace the crankshaft.

Crankshaft Main Bearing > < Connecting Rod Bolt Inspection