Odyssey L4-2.2L SOHC (1995)
3. Rotate adjusting bolt to obtain specified toe-in.
4. Install new locknut and torque nut to 40 ft. lbs. while holding adjusting bolt, then ensure toe-in is still within specifications.
3. Rotate adjusting bolt to obtain specified toe-in.
4. Install new locknut and torque nut to 40 ft. lbs. while holding adjusting bolt, then ensure toe-in is still within specifications.