Spider pin should be smooth and free from fretting or galling. Visible signs of needle presence is normal, but wear should not be felt.

-

Preload of the universal joint. 
Preload should be 0 to 24.9 kg (0 to 11.3 lbs.). 
Joints should rotate smoothly and freely and should exhibit no rough or ratchety movement.

-

Inspect splines for wear. 
The nylon-coated spline should be free from nicks and dings and the underlying steel spline should not be visible. 
After cleaning the nylon coating spline, the coating should exhibit only slight indicator of wear. 
Grease volume is approximately 10 grams of grease in total. Grease should be evenly applied to both the female and the male slip splines using a
small brush. After assembly of the slip joint, the sliding joint should be fully worked from the full collapsed to the full extended position.

-

Aluminum tube type only: Inspect the aluminum tubing for surface scratches and dents. These scratches may not exceed 0.2 mm (0.008 inch) in
depth.

-

Aluminum tube type only: Visually inspect the circle welds and fittings for any signs of cracks or signs of deterioration. If there are any cracks that
exceed 0.2 mm (0.008 inch) in depth, the assembly must be replaced.

-

Aluminum tube type only: Check to be sure there are no missing balance weights. If balance weights are missing and void has occurred in the
aluminum tubing greater than 0.2 mm (0.008 inch), the assembly must be replaced.

UNIVERSAL JOINT REASSEMBLY

1. Pack the four grease cavities of the spider with a high quality, extreme pressure N.L.G.I. Grade 2 grease. Do not add additional grease to bearing

cup assembly.

2. Move one end of the spider to cause a trunnion to project through the spider hole beyond the outer machined face of the yoke lug. Place a bearing

over the trunnion diameter and align it to the spider hole. Using an arbor press, hold the trunnion in alignment with the spider hole and place a
solid plug on the upper bearing. Press the bearing into the spider hole enough to install snap ring.

3. Install a snap ring.

NOTE:  Be sure the snap rings are properly seated in the grooves.

4. Repeat steps 2 and 3 to install the opposite bearing. If the joint is stiff, strike the yoke ears with a soft hammer to seat the bearing.
5. Align the setting marks and join the yokes.

Front Drive Shaft|Page 4372 > < Front Drive Shaft|Page 4370