hummer Workshop Repair Guides

Hummer Workshop Service and Repair Manuals

Intake Manifold Replacement|Page 2898 > < Intake Manifold Replacement|Page 2896
Page 11
background image

Tighten the bolts to 10 N.m (89 lb in).

7. Install a NEW throttle body gasket to the intake manifold.
8. Install the throttle body.
9. Install the throttle body bolts/nuts.

Tighten the bolts/nuts to 10 N.m (89 lb in).

10. Install the EVAP tube and purge solenoid.
11. Install the EVAP canister purge solenoid to the fuel rail bracket and engage the retainer.
12. Connect the EVAP tube quick connect fitting at the intake manifold. Refer to Plastic Collar Quick Connect Fitting Service  (See: Powertrain

Management/Fuel Delivery and Air Induction/Fuel Line Coupler/Service and Repair/Plastic Collar Quick Connect Fitting Service) .

Intake Manifold Replacement|Page 2898 > < Intake Manifold Replacement|Page 2896