hummer Workshop Repair Guides

Hummer Workshop Service and Repair Manuals

Grounding Point > < Diagram Information and Instructions|Page 11288
Page 4
background image

Notice:  Refer to Fastener Notice  (See: Service Precautions/Vehicle Damage Warnings/Fastener Notice) .

5. Install the positive battery cable (3) over the stud and install the retaining nut (2).

Tighten the nut to 10 N.m (89 lb in).

6. Install the underhood electrical center cover (1) to the electrical center base (5).
7. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection  (See: Starting and Charging/Battery/Battery

Cable/Service and Repair) .

8. Close the hood.

Grounding Point > < Diagram Information and Instructions|Page 11288