Veracruz AWD V6-3.8L (2007)
b. Disconnect connector (B), and measure for resistance between connector (C) and (B1) and between (B2) and (A) as shown in [FIG. 3].
In this case the measured resistance between connector (C) and (B1) is higher than 1 Mohm and the open circuit is between terminal 1 of
connector(C) and terminal 1 of connector (B1).
3. Voltage Check Method
a. With each connector still connected, measure the voltage between the chassis ground and terminal 1 of each connectors (A), (B) and (C) as
shown in [FIG. 4].
The measured voltage of each connector is 5 V,5 V and 0 V respectively. So the open circuit is between connector (C) and (B).
CHECK SHORT CIRCUIT
1. Test Method for Short to Ground Circuit
-
Continuity Check with Chassis Ground
If short to ground circuit occurs as shown in [FIG. 5],the broken point can be found by performing Step 2 (Continuity Check Method with Chassis
Ground) as shown.
2. Continuity Check Method (with Chassis Ground)
NOTE: Lightly shake the wire harness above and below, or from side to side when measuring the resistance.