hyundai Workshop Repair Guides

Hyundai Workshop Service and Repair Manuals

Sensors and Switches - Power and Ground Distribution > < Relay Box (Engine Compartment)|Page 6273
Page 1
background image

Relay Box: Testing and Inspection
ICM (Integrated Circuit Module) Relay Box

Inspection

HEAD LAMP WASHER

Check for continuity between the terminals.

1. There should be continuity between the No.6 and No.14 terminals when power and ground are connected to the No.13 and No.14 in the ICM-A.
2. There should be no continuity between the No.6 and No.14 terminals when power is disconnected.

ADJUST PEDAL TWIN RELAY

Check for continuity between the terminals.

1. There should be no continuity between the No.11 and No.12 terminals or between the No.5 and No.12 terminals when power and ground are

connected to the No.13 and No.14 in the ICM-B.

2. There should be continuity between the No.11 and No.12 terminals or between the No.5 and No.12 terminals when power is disconnected.

FRONT WIPER WASHER

Check for continuity between the terminals.

1. There should be continuity between the No.1 and No.7 terminals when power and ground are connected to the No.1 and No.10 in the ICM-A.
2. There should be no continuity between the No.1 and No.7 terminals when power is disconnected.

FRONT WIPER

Check for continuity between the terminals.

1. There should be continuity between the No.2 and No.3 terminals when power and ground are connected to the No.1 and No.9 terminals in the

ICM-A.

2. There should be no continuity between the No.2 and No.3 terminals when power is disconnected.

POWER TAILGATE

Check for continuity between the terminals.

1. There should be continuity between the No.5 and No.11 terminals when power and ground are connected to the No.12 and No.4 terminals in the

ICM-A.

2. There should be no continuity between the No.5 and No.11 terminals when power is disconnected.

Sensors and Switches - Power and Ground Distribution > < Relay Box (Engine Compartment)|Page 6273