XG 350 V6-3.5L (2002)
Clockspring Assembly / Spiral Cable: Testing and Inspection
CLOCK SPRING
1. If, as a result of the following checks, even one abnormal point is discovered, replace the clock spring with a new one.
2. Check connectors and protective tube for damage, and terminals for deformities.