EX35 AWD V6-3.5L (VQ35HR) (2009)
3. Install boot and boot bands to shaft.
CAUTION:
-
Wrap serration on shaft with tape (A) to protect the boot from damage.
-
Never reuse boot and boot band.
4. Remove the tape wrapped around the serration on shaft.
5. Position circular clip (1) on groove at the shaft edge.
CAUTION:
Never reuse circular clip.
NOTE:
Drive joint inserter is recommended when installing circular clip.
6. Align both center axles of the shaft edge and joint sub-assembly.
7. Install joint sub-assembly (1) to shaft using plastic hammer.
CAUTION:
Confirm that joint sub-assembly is correctly engaged while rotating drive shaft.
8. Fill serration slot joint sub-assembly with NISSAN genuine grease or equivalent until the serration slot and ball grove become full to the brim.
Standard
Grease amount : Refer to FAX-32, "Drive Shaft". See: Specifications/Front Axle/Drive Shaft